Base Isolation for Buildings: Seismic and Vibration
One principle, two problems: keeping the ground’s motion out of the building, whether it comes from an earthquake or a railway. Isolation engineering, assessment of existing buildings and independent peer review.
- Eurocode 8 (opens in a new tab)
- BS EN 15129
- ISO 22762
- ASCE 7 (opens in a new tab)
- BS 6472-1
- BS 7385-2
- BS EN 1337-3
- Your local code

Start here
What do you need to isolate?
Base, building, structural, seismic isolation: the terms overlap, and the same word can mean two very different things. Pick what you are protecting, and from what.
- A building · from earthquakesSeismic isolation Keeping the structure, its contents and its operations running after an earthquake.
- A building · from vibrationGround-borne vibration A railway, metro, tram line, road or industrial plant next to the site.
- Equipment or machineryHeavy-duty & tailor-made isolators Seismic spring isolators for plant: our ASI-T series, on its own page.
One physical answer
A building sits on the ground, so it inherits whatever the ground does. Base isolation is the decision to break that connection deliberately: a flexible layer between the structure and its foundations that lets the ground move without carrying that movement into the building above.
Under an earthquake, isolation lengthens the building’s response period and decouples it from the sharpest part of the ground motion. Under a passing train, the problem is not force but perception: low-frequency vibration that occupants feel, and the noise it re-radiates into quiet rooms. Different input, different criteria, the same physical answer — and the same hard part: everything that has to cross the isolation plane and still work.
01Base isolation for seismic protection
Conventional seismic codes are written around life safety. They accept that a compliant building may be damaged beyond economic repair, and its contents lost. For a hospital, a data centre, a factory or any asset whose interruption cost dwarfs its repair cost, that trade-off is wrong. Isolation moves the objective from the building survived to the building was operational the next morning.
It is not the right answer everywhere, and the most useful early conversation is usually about whether it is. Where the conditions are absent, conventional ductile design or supplementary damping will often deliver more for less.

What we offer
- Feasibility and concept assessment against the continuity requirement
- Isolation system selection: elastomeric, lead-rubber, friction pendulum, hybrid
- Displacement demand assessment and isolation gap definition
- Supplementary damping as an alternative or complement
- Isolator specification, procurement support and test regime review
- Seismic joints and the isolation interface
- Non-linear time-history analysis for isolated structures
Existing buildings
Most isolation and strengthening work begins with a building that already exists: is it good enough, and if not, what is the cheapest sufficient intervention. We screen and assess against Eurocode 8 Part 3 or the national code, compare retrofit strategies, and frame assessments against the emerging second-generation Eurocode 8 where that matters.
Resilience and post-event operability
The question an owner needs answered is rarely “will it collapse”. It is “how long will we be out”. We estimate post-event operability and recovery paths for the structure and its critical systems, and give engineering input to insurance and risk-transfer discussions.
02Base isolation for vibration
Ground-borne vibration is the reason most buildings in the UK and Ireland end up isolated. In residential, hotel, studio, laboratory and performance spaces it is routinely the difference between a scheme that gets consent and one that does not — and it is almost always cheaper to design for at foundation stage than to fix afterwards.
Isolating the building at its base is the most complete answer. Where it is not justified, the same thinking scales down: a box-in-box, an isolated slab, or isolation confined to the sensitive part of the building.

What we offer
- Feasibility and concept assessment, including what lighter alternatives would achieve
- Isolation strategy: full base isolation, box-in-box, floating slabs, partial isolation
- Bearing and isolator selection and layout against load distribution and target frequency
- Transmissibility assessment against the frequency content of the source
- Load schedule coordination with the structural engineer
- Isolation plane detailing: services, drainage, lifts, stairs, cores, façade, waterproofing
- Review of an existing or proposed isolation design against the project criteria
Setting the vibration criterion — site measurement and prediction — is acoustic consultancy work, usually already appointed. Our work starts from that criterion. For vibration generated inside the building, see noise and vibration control: that page stops vibration at the machine; this one stops it at the foundation.
Independent peer review
For both seismic and vibration isolation, an independent second opinion reliably pays for itself. It does not displace the design team and can be scoped tightly: design and retrofit proposals, non-linear analysis models, design basis against the owner’s continuity requirement, isolator specification and test evidence.
Where we work
Vibration isolation: the UK and Ireland first. Seismic design is not required for ordinary UK buildings, yet base isolation is built here regularly — the case for it is written by a railway, not an earthquake.
Seismic isolation: across EMEA, for owners and design teams in those regions, for UK-based clients with assets there, and for owners, insurers and funders who need that work independently reviewed. Where UK formal design responsibility applies, it rests with the project’s appointed chartered structural engineer; we provide the analysis, isolation engineering and documentation that feed that process.
Terms you may have searched
Questions
Is base isolation the same as seismic isolation?
Seismic isolation is base isolation designed against earthquakes. Base isolation is the wider term: in the UK it most often means isolating a building from ground-borne vibration.
Base, building or structural isolation — what is the difference?
In practice, none: all three mean isolating the whole structure at or near its foundations. "Structural" separates it from isolating the equipment inside the building.
What if I am looking for a seismic isolator for equipment?
For a building, a seismic isolator is a bearing that carries the structure. For plant, the same name usually means a spring isolator with built-in seismic restraint. That is our ASI-T series.
Does a building in the UK need seismic isolation?
Ordinary buildings, no. Mission-critical facilities, assets in an international portfolio and high-consequence structures may. If your building has neither a seismic case nor vibration exposure, we will tell you that you do not need us.

Describe the site and what the building has to withstand.
We will tell you whether isolation is the answer — and if it is not, what is.